Skip to content

Completion management, connected

From construction to handover.

TASLEEM CMS connects punch lists, inspection and test records, dossiers and certificates to each system and sub-system. Your team can see what is ready, what is blocking handover and who needs to act.

Project overview

Readiness

64%

Open punches

38

ITRs approved

71%

Pending sign-offs

12

Completion by system

Utilities
88%
Process area A
67%
Electrical
52%
Fire & gas
34%
Illustrative example, not live project data.
  • Admin-defined stage gates
  • Linked ITRs, punches & dossiers
  • System & sub-system readiness
  • Server-side audit trail

Why Tasleem

The last mile shouldn’t be the hardest to manage.

Completion often runs on spreadsheets, email threads and shared folders. Then the closest work to handover becomes the hardest to track.

Scattered records

Punches, test sheets and dossier documents sit in different files, each with its own version of the truth.

Unclear next steps

Nobody can say which items block a sub-system, or who is meant to sign them off.

Late handover surprises

Missing evidence and open Cat A items show up when the turnover pack is being put together, not before.

One source of truth

Different records. One connected picture.

  • Punch lists

    Cat A/B/C items with photo evidence, closure remarks and approver sign-off.

  • Inspection & test records

    ITR types mapped to your stages, with on-screen checks and signatures.

  • Dossiers & handover

    Dossiers built from your master index for each sub-system, and turnover packs put together from approved records.

Linked records · Sub-system SS-101-01
TypeSub-systemRefStatus
PunchSS-101-01Cat APending approval
ITRSS-101-01E-01AApproved
DossierSS-101-01MC dossierDraft
CertificateSS-101RFSUPending approval
Illustrative example, not live project data.

The workflow

One path to completion. No disconnected last mile.

Admins define the stages and milestones in the Workflow Designer, and the default sequence follows the usual completion path. Records stay linked to their system and sub-system the whole way.

  1. STEP 1

    Mechanical completion

    Construction ITRs and punches closed out. The MC dossier is compiled.

  2. STEP 2

    Pre-commissioning

    Pre-comm checks are recorded and outstanding items stay visible.

  3. STEP 3

    Commissioning

    Commissioning ITRs are tracked against each sub-system.

  4. STEP 4

    Ready for start-up

    RFSU readiness is gated on approved records.

  5. STEP 5

    Handover

    Certificates are approved and issued, and the turnover dossier is compiled.

Stage names, order and milestones are configurable per your project.

Punch · P-0142

Missing cable gland on junction box

Cat A · Open 9 days · Sub-system SS-101-01

Assigned approver

qaqc.lead@example.com

Pending approvalApproveReject
Illustrative example, not live project data.

How it works

Know what needs attention. And who owns it.

Each record names its approver by email. Only that signed-in person can approve it, and the database enforces this as well as the screen. Submitted records are locked while they wait for review, so nobody can quietly change an item mid-approval.

  • Request approval, then approve or reject with comments
  • Open punches sorted by age, with overdue limits for each category
  • Pending sign-offs collected on the dashboard

Readiness & traceability

A clear path forward. A full trail behind.

Readiness for each system and sub-system is calculated from approved ITRs, closed punches and required dossier documents, and the formula is open for anyone to check. Every submission, decision and reopen is logged by the server with who did it and when.

Sub-system SS-101-01 readiness
ITRs approved
80%
Punches closed
62%
Required documents
45%
  1. Approved by qaqc.lead@example.com
  2. Submitted for approval
  3. Photo evidence attached
  4. Created
Illustrative example, not live project data.

Potential savings

Better control is where cost savings begin.

We don’t promise a fixed figure. Savings depend on your project. These are the areas where better control usually helps.

Less duplicate administration

Record each item once instead of retyping it across trackers.

Fewer missed items and repeat checks

Required documents and open punches stay visible against each sub-system.

Less time finding evidence

Photos, signatures and attachments stay with the record they prove.

Fewer avoidable delays

Blockers and pending approvals surface early, not at handover.

Who it’s for

Different responsibilities. Shared clarity.

Project teams

See progress and blockers by system, and import existing registers from Excel.

QA/QC

Record inspections, sign on screen and approve only the records assigned to you.

Commissioning

Follow stage-gated ITRs and track equipment preservation routines.

Management & client

Review readiness, progress curves, certificates and turnover dossiers.

FAQs

Questions, answered.

What does TASLEEM CMS manage?

Punch lists, inspection and test records (ITRs), sub-system dossiers, certificates and milestones, equipment preservation, and turnover dossiers. Everything is linked to your system and sub-system hierarchy.

Can we change the stages and dossier requirements?

Yes. Admins use the Workflow Designer to add, rename, reorder or disable stages, ITR types, dossier types and milestones. They also maintain the dossier master index. Options already used by records can be disabled, but not deleted.

How are approvals controlled?

Each record has an assigned approver email. Only the signed-in user with that email can approve, and the database enforces this. Submitted records are locked, and every decision is logged on the server.

Can we bring in our existing registers?

Yes. Admins can upload Excel or CSV registers. The importer suggests column matches, flags errors so you can fix them, and creates any missing systems or sub-systems.

Does it work offline in the field?

The field inspector saves results and signatures on the device and syncs them when the connection returns. We recommend piloting this on your own tablets before relying on it on site.

Will it save us money?

It may. Less duplicate admin, fewer missed items and earlier visibility of blockers can reduce cost and delay, but results depend on your project. We don’t guarantee a figure.

Request a demo

Bring your project across the finish line.

See how TASLEEM CMS could fit your project’s systems, stages and handover requirements.

Demo requests aren’t connected yet, so this form doesn’t send anything. Existing users can sign in.